Nylon Training Dog Leash for Small Medium Large Dogs, 15ft 20ft 30ft...
- Dog Leash Dimensions: training leash measures 3/4 inch width by 15 feet length, offering you dog for more wandering area and freedom.
- Nylon Long leash: long lead is made of strong wear-resistant nylon, available in Black, Blue, Red and Green color.
Last update was on: April 21, 2024 2:01 pm
$6.99
- Dog Leash Dimensions: training leash measures 3/4 inch width by 15 feet length, offering you dog for more wandering area and freedom.
- Nylon Long leash: long lead is made of strong wear-resistant nylon, available in Black, Blue, Red and Green color.
- Dog training leashes: suitable for teaching your dog/puppy recall and other obedience skills, great for small, medium, large dogs.
- Easy on and Easy off: Swivel-style bolt snap resists twisting. 360 degree tangle free swivel heavy duty clasp gives your dog best freedom.
- The dog training leash is built to last. If you have any question, please contact us, we will solve the problem until you are satisfied.
$12.99
in stock
Ebay.com
$11.89
in stock
Ebay.com
$7.82
in stock
Ebay.com
$10.09
in stock
Ebay.com
$11.99
in stock
Ebay.com